Electrical drawings in. Reviewed tag data out.
PLC Automator reads your electrical schematics and drafts the tag database, documentation and controls code. A qualified engineer reviews the flagged rows and approves the output.
- Title
- Pump station digital inputs
- Drawing
- 04, sheet 4 of 6
- Checked
- Not yet checked
| Tag | Description | Address | Memory | Wire |
|---|---|---|---|---|
| P1_AUTO | Pump #1 Auto Status | I:0.0 | %M400 | 0/0 |
| P1_RS | Pump #1 Run Status | I:0.1 | %M401 | 0/1 |
| P1_FLT | Pump #1 Fault Status | I:0.2 | %M402 | 0/2 |
| WW_LO_FLOAT | Wet Well Low Float | I:0.3 | %M403 | 0/3 |
| P2_AUTO | Pump #2 Auto Status | I:0.4 | %M404 | 0/4 |
| P2_RS | Pump #2 Run Status | I:0.5 | %M405 | 0/5 |
| P2_FLT | Pump #2 Fault Status | I:0.6 | %M406 | 0/6 |
| SPARE_DI_0_7 | Needs review: Visible row is spare/blank without field-side text | I:0.7 | %M407 | 0/7 |
- PDF schematics in
- Upload the drawing set you already have.
- Vendor tag files out
- XBD and XML packs, formatted for your PLC software.
- Every tag traced
- Each record links back to its place on the drawing.
- Nothing locked in
- The drawings and the outputs stay yours.
| Row | A | B | C |
|---|---|---|---|
| 1 | Tag | Description | Address |
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 |
Wrong tag: P1_FTL should be P1_FLT. Nobody notices until testing.
Most projects still start with someone typing the tag list by hand.
- Typed line by line
- Tag lists, alarm lists and I/O schedules are copied from the drawings into spreadsheets by hand.
- Found during testing
- A typing error in the tag list shows up at factory acceptance testing or on site, when it is slow and costly to fix.
More done by the same engineering team
It does not replace engineering judgement. It removes repeated data transcription, so engineers spend their time on review, design and commissioning.
Questions about fit? We are a small team. We answer every email personally, usually within one business day.
For the integrator
More delivery capacity, better repeatability and stronger fixed-price and unit-rate execution.
For the engineer
Less repetitive spreadsheet work. More time for review, design, testing, commissioning and training.
For the end client
Faster, traceable and consistent engineering data, with fewer errors to fix during FAT and commissioning.
From drawing to vendor export
- 1
Import the drawing set
Choose the PDF and the pages that hold the I/O.
- 2
Extract the tags
Tag names, descriptions and addresses are read from each line of the drawing.
- 3
Apply your conventions
Alarms, bypasses and delays are generated to your naming rules.
- 4
Export for your PLC
Produce a data pack for Schneider Electric, Allen-Bradley or Siemens.
Start where the repeated work is
- Tag data packs
- PLC and HMI tag databases with your naming rules, descriptions and source references, exported for your vendor environment.
- Documentation inputs
- Test sheets and verification documents, so the commissioning team arrives ready.
- Panel and SCADA mapping
- Address lists and communication registers aligned for screen configuration, such as C-more.
- Logic and alarm blocks
- Standard code routines and customer-approved alarm logic, with as much or as little automation as the engineer chooses.
PLC Automator does not deploy PLC code, connect to live OT systems or make unreviewed safety or process decisions.
Your engineering data stays yours
For each controlled pilot, we agree the permitted drawings, processing route, authorised users and retention period before work begins. We process only what the agreed workflow needs.
Pilot material is not used for demonstrations or other development without your written permission.
Your drawings
Retention and access are agreed before any work begins.
Private model
Processing runs on privately hosted models in our AWS environment. Pilot material is never used to train AI models.
Your data pack
You keep all rights to your drawings and outputs. No live OT connection, no code deployment and no unreviewed decisions.
Prove it on one agreed drawing set
Start with one drawing type and a controlled output. We measure preparation time, review effort, exceptions and how useful the output is before proposing anything broader.